Scout

N0001426SN003

ONR Innovation Industry Day (I2D): Power & Energy

DEPT OF DEFENSE > DEPT OF THE NAVY > ONR > ONR HQS > OFFICE OF NAVAL RESEARCH

Actions
Open SAM.gov
Notice Type Special Notice
Due 2026-05-01
Posted 2026-04-02
NAICS 541715
PSC AC12
Set-aside No Set aside used
Scout Score 44

Quick analysis

Special Notice for an in-person ONR Innovation Industry Day focused on Power & Energy (TRL 1–6) under ONR’s Long Range BAA (N0001425SB001).

Event is informational to shape FY27 white paper opportunities; registration due May 1, 2026; PFPA visitor approval required for entry; one attendee per company; Arlington, VA on May 14, 2026.

Technical domain (energy storage, generation, thermal management, power distribution/control/resilience) is outside Trace’s core SATCOM/CDS/edge compute lanes, but attendance is low-risk, local, and could open/shape ONR 541715 opportunities relevant to power resilience at the tactical edge.

Scope summary

  • Register one company representative by Fri May 1, 2026 16:00 EST (ledger).
  • Submit PFPA VMS application; obtain PFPA approval email by Fri May 8, 2026 17:00 EST (ledger).
  • In-person attendance at BJECC, One Liberty Center, 875 N Randolph St, Arlington, VA on Thu May 14, 2026 (check-in 07:00, meeting 09:00) (ledger).
  • Bring government-issued ID; comply with screening and recommended limits on electronics (ledger).
  • Comply with dress code (military uniform of the day or business casual) (ledger).
  • Engage within ONR Long Range BAA framework; potential follow-on via FY27 white paper submissions (ledger).

Dimension scores

Total - 44/100
Technical Fit - 3/20

Scope centers on early-stage Power & Energy R&D (TRL 1–6) across energy storage, generation, thermal management, and power distribution/control/resilience (ledger: technical scope). Trace’s core capabilities emphasize SATCOM/LEO integration, CDS, tactical edge compute, C5ISR, and managed IT (company_profile.txt), not power/energy R&D. Only indirect adjacency via power resilience/thermal needs for edge compute; therefore weak technical fit.

Past Performance - 3/20

Trace’s listed past performance spans DISA MPE-S, USAF/USSF programs, MDA SHIELD, Army FSR/GTACS II, etc. (company_profile.txt). No evidence of ONR or Navy S&T power/energy R&D efforts. This is a new customer/mission area in 541715; limited transferability.

Vehicles / Contract Access - 5/10

The notice is tied to ONR’s Long Range BAA (N0001425SB001) and is an open industry day (ledger: purpose/compliance). Not issued on a Trace-held vehicle; however, access is full & open without restricted vehicle barriers.

Competitive Position - 4/15

Event targets non-traditional/innovative partners in power/energy (ledger: audience/purpose). In this domain, energy tech firms, labs, and universities are likely stronger. No incumbent or differentiator (e.g., NSA TI) is required here; Trace lacks domain-specific edge, so field is crowded with better-aligned competitors.

Risk - 13/15

In-person attendance in Arlington, VA with clear registration/PFPA steps (ledger: registration & security). No unusual technical or staffing execution risk at this stage; low operational risk to attend. Minor schedule/compliance risk tied to deadlines only.

Strategic Value - 6/10

Participation could open/shape a relationship with ONR and inform FY27 541715 white papers (ledger: purpose). Potential adjacency to Trace’s tactical edge compute and power distribution/resilience considerations for expeditionary C5ISR, though core topic is outside primary lanes. Moderate, evidence-based strategic value.

Compliance - 10/10

Set-aside: None (ledger: access_and_scope). Requirements are administrative (registration by May 1, PFPA approval by May 8, government ID, one attendee). Trace can meet these with local presence and no special certifications needed.

Concerns

  • Technical domain (power/energy TRL 1–6) is outside Trace’s core competencies; limited immediate capture relevance (ledger + company_profile).
  • Event is informational; no guaranteed funding, ROI depends on shaping and subsequent white papers (ledger).
  • One-seat limit constrains multi-discipline representation (ledger: one representative per company).
  • Follow-on efforts may require specialized power/energy R&D labs/partners not currently identified in Trace capabilities (company_profile).

Teaming opportunities

  • Power/energy R&D SMEs in energy storage and generation (TRL 1–6).
  • Thermal management expertise for high-power electronics and edge compute enclosures.
  • Power distribution/control/resilience specialists (microgrids, shipboard/expeditionary power).
  • Established ONR performers (universities, FFRDCs, non-traditional vendors) for future white papers under the LRBAA.

Competitive position

  • Position Trace as an integrator focused on power distribution resilience and thermal performance for tactical edge compute and C5ISR nodes supporting expeditionary comms.
  • Leverage E&I Facility and SE&I/test capabilities to prototype and validate power-resilient edge architectures relevant to Navy use cases.
  • Highlight OCONUS deployment experience and managed services (OCC) to support resilient power for forward-deployed SATCOM/edge systems.

Bid/No bid factors

  • Topic area targets TRL 1–6 energy R&D, which is not a Trace core lane (company_profile).
  • This is an industry day/special notice, not a funded solicitation; benefits are indirect and contingent on future actions (ledger).

Documents

Download all
ONR Innovation Industry Day (I2D) N0001426SN003.pdf Download
Summary

Special Notice announcing ONR’s Innovation Industry Day (I2D) for Power & Energy on May 14, 2026 at the Bobby Junker Executive Conference Center in Arlington, VA. The event solicits industry feedback to inform FY27 white papers and focuses on S&T challenges (TRL 1–6) across Energy Storage, Power Generation, Thermal Management, and Power Distribution/Control/Resilience. Registration is required (one representative per company), with key deadlines for registration (May 1) and PFPA VMS access (May 8).

  • Event: ONR Innovation Industry Day (I2D) — Power & Energy; date: May 14, 2026; check-in 07:00 EST, meeting 09:00 EST
  • Location: Bobby Junker Executive Conference Center (BJECC), One Liberty Center, 875 N Randolph St, Arlington, VA — Room 1435 (Place of performance = Arlington, VA)
  • Purpose: Solicit direct industry feedback to inform future S&T opportunities and encourage FY27 white paper submissions under ONR Long Range BAA (N0001425SB001)
  • Technical scope: Topics include Energy Storage; Power Generation; Thermal Management; Power Distribution, Control & Resilience — target TRL 1–6
  • Audience & limits: Registration limited to industry partners (no media); one representative per company; no registration fee but advance registration required
  • Registration & security: Registration deadline Fri May 1, 2026 16:00 EST; PFPA VMS application required by Fri May 8, 2026 17:00 EST; ONR will submit names to PFPA; PFPA approval email mandatory for entry; required government ID and PFPA approval for building access
  • Logistical notes: Parking info, dress code (military uniform of the day or civilian business casual), recommendation to limit electronic devices for screening
  • Points of Contact: Technical POC — Chris Marchefsky (christopher.m.marchefsky.civ@us.navy.mil); Contracting Officer — Leila Hemenway (leila.k.hemenway.civ@us.navy.mil); Logistics — Terrence Calhoun (terrence.m.calhoun.ctr@us.navy.mil)
  • Compliance/administrative linkage: Event is a Special Program Announcement under ONR’s Long Range BAA; questions and answers will be posted to sam.gov and ONR announcements page
  • Access implications: CONUS, in-person attendance at ONR HQ required — PFPA visitor processing and ID required, may limit participation for companies lacking quick-access to VA-based attendance or for those with classified requirements
Technical details

Entry: sync

Review status: Up to date

Logical upstream opportunity: 11347

Notice lineage:

  • a46dc5f34e714e7d8210e4529cb7f9e2 (posted 2026-04-02) - current
  • 87d50461402e43ffb3ead43e62bd12e2

Last synced: 2026-04-07T14:38:16.092606+00:00

Last analyzed: 2026-04-03T14:54:05.885248+00:00

Latest package fingerprint: 3929354891aab2a55f47e8d6ba392df4d615fd20c62159264c3d4b759015aea6

Latest package notice: a46dc5f34e714e7d8210e4529cb7f9e2

Latest package documents: 1

Recent package history
  • 2026-04-03T14:53:00.679067+00:00: a46dc5f34e714e7d8210e4529cb7f9e2 with 1 docs

Labels

Human notes

Qualification Settings

Included notice types

Scope Filters

Use one code or phrase per line, or comma-separate.

System Settings

Runtime

Custom Search

Search time

These filters apply only to this run. Qualification settings stay unchanged.

Custom Search queries Fetchmesh and stores the results in Scout without mutating the default sync configuration.

Workspace visibility

All custom searches are public for now.

Included notice types

Scope Filters

Use one code or phrase per line, or comma-separate.

Browse Searches